Therio

The Digital Heartbeat of Dairy Cows

Schaefer Ventilation Equipment

By Schaefer Ventilation Equipment

Last reviewed: February 2026

Panel fans, HVLS fans, recirculation fans, and portable cooling units engineered for the corrosive dairy barn environment.

American-made barn fans and ventilation systems from Schaefer, including panel fans, circulation fans, and HVLS fans designed for heat stress abatement in dairy operations.

Key Features

  • Panel Exhaust Fans: 24-inch to 57-inch blade diameters for sidewall and endwall exhaust
  • HVLS Ceiling Fans: High-volume low-speed fans for large freestall barns
  • Recirculation Fans: Basket and drum fans for cow-level air movement over freestalls
  • Versa-Cool Portable Fans: Portable evaporative cooling for holding areas and special pens
  • Corrosion-Resistant Build: Fiberglass housings, sealed motors, stainless steel hardware

Advanced Features

  • Direct-Drive Motors: Eliminates belt maintenance and reduces energy consumption
  • Variable Speed Controls: Temperature-responsive fan speed for automated ventilation

Ideal For

Farm Types: Freestall dairies, Tunnel-ventilated barns, Holding pen cooling

Competitive Advantages

What sets Schaefer Ventilation Equipment apart from alternatives:

  • 50+ years of ventilation manufacturing experience
  • Fiberglass housings resist corrosion in dairy environments
  • Direct-drive designs eliminate belt maintenance
  • Made in USA (Sauk Rapids, Minnesota)

Pricing Information

Here is the pricing information for Schaefer Ventilation Equipment:

Schaefer fans range from approximately $300-500 for recirculation fans to $1,500-4,000+ for large panel and HVLS fans. Contact Schaefer or your dealer for quotes.

Pricing Model: Per unit equipment purchase

Pros & Considerations

Advantages:
  • 50+ year track record
  • Corrosion-resistant construction
  • Wide range of fan types and sizes
  • Direct-drive reliability
Considerations:
  • Premium pricing vs. imported fans
  • Ventilation design expertise needed for optimal layout
  • Electrical infrastructure upgrades may be needed

Implementation & Setup

How to implement Schaefer Ventilation Equipment on your dairy operation:

Implementation Timeline: 2-6 weeks for ordering and installation

Training & Support

Training and support options available for Schaefer Ventilation Equipment:

Support Channels:

    Evaluation Questions

    Key questions to consider when evaluating Schaefer Ventilation Equipment:

    1. What is your current barn ventilation rate (air changes per hour)?
    2. Do you have heat stress problem areas (holding pen, close-up pen)?
    3. What is your electrical capacity for additional fan motors?
    4. Are you building new or retrofitting an existing barn?

    Related Articles

    Dairy Industry News Roundup: Week of February 14 - February 20, 2026
    USDA Announces $148 Million in Dairy Purchases as Part of $263 Million Food Buy
    Dairy Industry News Roundup: Week of February 7 - February 13, 2026
    World Ag Expo 2026: Live Updates from Tulare
    Dairy Industry News Roundup: Week of January 31 - February 6, 2026

    Therio Research Guides

    Expert, editorially independent guides comparing dairy technology products and platforms: